Newman Catholic College has been master planned for a contemporary, twenty-first century education, multi-level vertical design, to be constructed in four stages over a 10-year period. Stage 1 construction will take place in 2021 to accommodate Year 7 in 2022 and Years 7 and 8 in 2023. Newman Catholic College will reach Year 12 in 2027.

New schools and colleges are built in stages to meet funding requirements. This sometimes necessitates the provision of temporary facilities in classroom areas that are then converted to their permanent use as the staged development progresses. When complete, Newman Catholic College will have 45 classroom spaces comprising 24 general learning area classrooms and 21 specialist teaching spaces.

1

Stage 1 (permanent configuration)

Canteen
Covered lunch areas
Tiered seating to circulation spaces
Multipurpose indoor sports court with tiered seating
2 x music/dance classrooms (stage 1 temporary library)
1 x drama classroom (stage 1 temporary administration space)
1 x Food science cooking classroom
5 x Design tech labs
1 x Flexible learning classroom
Learning support space
4 x science labs
2

Stage 2

3 x Art rooms
12 x GLA classrooms
Administration space
Staff & student amenities
3

Stage 3

Administration space
2 Level resource centre (library)
1 x Design tech classroom
1 x Science lab
2 x Flexible learning classroom
Staff & student amenities
4

Stage 4

12 x GLA classrooms
Administration space

Enrol at Newman

Apply Online

Request a brochure

Register for an information session